• Pipe measurements: Length (7.5m), Diameter (4m), weight (73-80ton).
  • Pipe carriers and cranes were manufactured specifically for the MMRP.
  • An approximation of five million tons of cement were used to make the pipes, which is enough to pave a concrete road from the city of Sirte in Libya to Mumbai in India.
  • 1300 wells were drilled, pumping a net 6.5million cubic meters of fresh water per day, serving each citizen with approximately 1000 liters.
  • The total depth of wells drilled in the desert for the MMRP is 70 times higher than Mount Everest summit point.
  • Pipe carriers travelled a distance equal to a round trip to the sun.
  • Steel wires used in the manufacturing of pipes are long enough to circle the earth 280 times.
  • There was enough aggregates used in the Project to build 20 Great Pyramid of Giza.
  • The pipe transportation system covered a distance of 3500km spread over an area equal to the area of Western Europe.